Arctech ScotlandArctech Scotland
  • Home
  • About
  • Our Services
    • Mechanical
    • Electrical
    • Renewables
    • Fire Suppression
    • Multi-Utilities
  • Case Studies
    • Care
    • Health and Leisure
    • Commercial and Office
    • Education
    • Residential
  • Careers
    • Job Vacancies
  • News
  • Contact
  • Home
  • About
  • Our Services
    • Mechanical
    • Electrical
    • Renewables
    • Fire Suppression
    • Multi-Utilities
  • Case Studies
    • Care
    • Health and Leisure
    • Commercial and Office
    • Education
    • Residential
  • Careers
    • Job Vacancies
  • News
  • Contact
previous
next

Stobhill Hospital, Glasgow

The Elgin and Mappin Ward of Stobhill Hospital in Glasgow is an award-winning facility that offers services to support acute mental health.

Working in partnership with BAM Construction and hub West Scotland, Arc-Tech (Scotland) was responsible for the installation of a turnkey Mechanical and Electrical services solution for the NHS Greater Glasgow and City (NHSGGC) operated facility which provides some of the most enhanced services in Scotland for those with functional mental health issues.

Built across two new-build blocks, the internal configuration has been designed as open-plan, conveniently designed around a series of enclosed courtyards aimed at providing outside, yet private, space for patients. A new ward, alongside a series of specialist adult in-patient and wellbeing services, has been set up alongside office and meeting space for staff and visitors.

The mental health facility is the second contract to have been undertaken by Arc-Tech on behalf of the NHS having previously worked with NHS Forth Valley whilst further experience has been gathered working with the St Andrew’s Hospice and the refurbishment of their palliative health facility in Airdrie.

The list of Services that were installed at Stobhill Hospital includes:

Mechanical

  • Incoming Service Gas
  • Hot and Cold Water Distribution
  • Above and Below Ground Drainage
  • Heating including CHP
  • LTHW Distribution
  • Ventilation
  • Automatic Controls (BMS)

Electrical

  • Main Switchgear and Cabling
  • Electrical Containment
  • Lighting Systems
  • Fire Systems
  • Security Systems including CCTV
  • Data and Comms

In the installation of corridor and plant room services, Arc-Tech also utilised BIM to design innovative prefabricated modules that were then installed on-site, generating programme savings and ensuring of enhanced quality in the support of the construction programme.

Since the project’s completion in late-2020, Arc-Tech has been announced as one of only two companies in Scotland as a Category 1 sub-contractor for BAM Construction enabling the delivery of contracts up to £10m in value and has since delivered a wide range of projects on behalf of the contractor across the breadth of the country.

Client:
BAM Construction and hub West Scotland

Contract Value:
£2m

< back
FaceBookTwitterLinkedIn
  • Privacy & Cookies
  • Site Terms
  • GDPR
Copyright © 2026 Arc-Tech Scotland. All rights reserved. Website by reflexblue
Gas SafeRECCNICEIC