Case Studies

Glenpark Early Learning Centre is located on Madiera Street, Greenock and was delivered as part of Inverclyde Council’s £270m school’s estate investment programme which has seen all educational facilities within the region upgraded or newly constructed.

The new centre has been constructed upon the former grounds of Greenock Academy situated on a prominent town centre location with views overlooking the estuary of the River Clyde and beyond toward Balloch.

A simple plan form was developed for the new centre in order to create a building that was easy to understand and navigate. On arrival through the main entrance, visitors and staff are greeted within a secure lobby space. Moving through this space there is a second larger lobby which provides a second layer of security and space for parents to gather at the start and end of the day. The administration office, parent’s room, accessible visitors toilet, IT hub and cleaner’s store are accessed from this lobby. From the lobby, there are security doors leading left and right in one direction to a 20 pupil 2-3 years playroom and, in the other direction, to an 80 pupil 3-5 years playroom. The playrooms themselves are semi-open with half-height, movable furniture.

There is also the addition of storage areas that are aligned with ‘pods’ containing toilets and an outdoor classroom space and to avoid disruption to teaching, staff areas are accessed from separate corridors which are reached from the inner lobby – this includes the staff room, staff toilets, a meeting room and general office.

Externally, the play area has a mix of turf and a covered, child-friendly surface that is complete with a series of low-rise climbing frames.

The centre itself is serviced by its own private car park and, to ensure long-term environmental performance, a series of renewable energy services have been installed including solar photovoltaic panels on the roof and a CHP energy unit, among others.

The full list of Arc-Tech’s M&E services for the new centre include:

Mechanical:

  • Sanitaryware
  • Above Ground Drainage
  • Internal Rainwater Downpipes
  • Water Services
  • Air Source Heat Pump Installation
  • LTHW Installation Incl Underfloor Heating
  • Ventilation
  • Automatic Controls
  • External Water & Fire Hydrants
  • Testing & Commissioning

Electrical:

  • Main Switchboard
  • Distribution Boards
  • Sub-Mains Cabling
  • Cable Containment
  • Internal Lighting and Emergency Lighting
  • Lighting Controls
  • Small Power
  • Mechanical Power
  • Structured Cabling and ICT
  • Fire Alarm System
  • Disabled Toilet Alarm System
  • CCTV
  • Dorr Access System
  • Intruder Alarm
  • Induction Loop Systems
  • Lighting and Surge Protection
  • Solar PV
  • External Lighting
  • Earthing and Bonding
  • Testing and Commissioning

Client:
Inverclyde Council/ hub West Scotland

Arc-Tech Services:
£500k

 

 

 