Centro House is a new, high-specification student housing block that was delivered on behalf of Stirling University located off-campus in the centre of the city.

Arc-Tech’s first step into the student housing sector saw works undertaken alongside Applied Capital comprising a full Mechanical and Electrical Services installation for a building that has space for up to 122 beds including 62 rooms split into flats with 5, 6, or 7 bedrooms with a shared kitchen/living complete with integrated appliances, three-quarter size bed, wardrobe, desk and an ensuite shower room.

All works were performed within a 32-week programme and delivered on time and on budget for the 18/19 academic year. The list of services installed by Arc-Tech include:

Mechanical:

  • Gas Installation
  • Earthing Installation
  • Soil, Wastes and Drainage
  • Dry Risers
  • Sanitaryware to Communal, 3rd Floor and DDA Bathrooms
  • Flue Installation
  • Cooling System to Comms Room
  • IPS and Vanity units to 31 Bathrooms

Electrical:

  • Electrical Heaters and Controls
  • External Lighting
  • Emergency Lighting
  • ICT Cat 6 Structured Cabling System
  • Access Control and Intercom
  • Fire Systems
  • EVC and Disable Alarm Systems
  • Lighting Protection
  • Automatic Controls/ BMS
  • CCTV
  • Induction Loop
  • Smoke Vent Rewire
  • LV Connection and Distribution
  • Small Power
  • Testing and Commissioning

Client:
Applied Capital

Arc-Tech Services:
£1.7m

 