Abbotsford House Luxury Suites is a newly launched care home that is located in Milngavie, East Dunbartonshire.

Located adjacent to an existing residential community, the site was formerly home to premises of Clober Golf Club comprising of primarily storage facilities for greenkeeper staff. Cearly visible across the road, the golf course enhances the care homes offering of being quiet and secluded, a key aim in creating a comfortable environment for the elderly residents by the client, Morrison Community Care Group.

This promotion of comfort is felt throughout the 45-bed development which has been specially designed to be easily navigated by the residents complimented by a wide range of facilities to encourage a “home from home” experience including private bathroom space with a variety of rooms that are fully adapted to suit those with decreased mobility, as well as four dining rooms; a hair and beauty salon; and a ten-seater cinema. Residents also have access to private gardens as well as a putting green.

Morrison Community Care also wanted to offer a full care service as regards nursing and health. As such, a specialist wing, which is open 24 hours a day, is located on the ground floor which enables trained staff to provide nursing to those that may require emergency treatment. To conform with health regulations, this area of the facility is designed differently with specialist equipment and bedding installed.

Residents from Morrison’s other care homes are free to have access to Abbotsford House’s luxury facilities.

Arc-Tech’s list of Services include:

Mechanical

  • Heating Installation and Distribution.
  • Plumbing and Above Ground Drainage Services
  • BMS Automatic Controls
  • Comfort Cooling
  • Thermal Insulation.
  • Water Treatment
  • Testing and Commissioning.
  • Sprinkler Systems

Electrical

  • Incoming Electrical Supplies.
  • Low Voltage Distribution and Switchgear.
  • Sub-mains Distribution.
  • Power Installation.
  • Lighting Installation.
  • Lighting Management
  • Emergency lighting.
  • External Lighting
  • Security Systems.
  • ICT Passive Cabling Installation
  • AV Containment
  • Fire Alarm Systems.
  • Lightning Protection.
  • Earthing and Bonding.
  • Mechanical Services Power Supplies
  • Testing and Commissioning

Including full design services, Arc-Tech completed the entire contract within a 7-month programme enabling the full launch of the facility and habitation in December 2017.

Client:
Morrison Community Care

Arc-Tech Services:
£925,000

Contract Value:
£7 million